I ordered a replacement on/off + air fitting for my CCM T2. I’ve been out of this game for a while now, so I’m looking for some guidance on how to ensure I have this set up correctly.
IMG_5814.jpg
IMG_5815.jpg
I’m pretty sure CCM already did steps 1 and 2 as that screw is not moving out of the air fitting (I believe it’s in reference to the screw in the photo below).
IMG_5816.jpg
On step 3, what o ring am I using and where am I placing it? I know I’m missing something because when I hook the on/off up to my T2 + air it up, it leaks where the air fitting connects to the on/off.
Also, should one of those small o rings be going inside the on/off where my tank makes contact with the on/off (see photo).
IMG_5818.jpg
Thanks in advance for helping me figure this out!
IMG_5814.jpg
IMG_5815.jpg
I’m pretty sure CCM already did steps 1 and 2 as that screw is not moving out of the air fitting (I believe it’s in reference to the screw in the photo below).
IMG_5816.jpg
On step 3, what o ring am I using and where am I placing it? I know I’m missing something because when I hook the on/off up to my T2 + air it up, it leaks where the air fitting connects to the on/off.
Also, should one of those small o rings be going inside the on/off where my tank makes contact with the on/off (see photo).
IMG_5818.jpg
Thanks in advance for helping me figure this out!
Comment